Site Overlay

MoU Clayco

THERON ENERGY, THERON H2O / CLAYCO CONSTRUCTION: 
STRATEGIC PARTNERSHIP MANDATE FRAMEWORK & COMPLIANCE

PARTIES IN MEMORANDUM OF UNDERSTANDING

  1. Founder, CEO, Patent Holder, and Sovereign Architect. Theron International Foundation, Theron Energy, and Theron Generators: Cornelius Basson Theron
  2. Senior Corporate Executive. Clayco Construction

MEMORANDUM OF UNDERSTANDING 
(MoU) – The Treaty

Between Theron Energy LLC (OEM), Theron Magnetic Generators (TMG), and [Florida USA Dealer Name/Theron Generators LLC]

1. Purpose of Agreement

This MoU establishes the cooperative framework for the supply and installation of proprietary Theron Permanent Magnetic Power Systems, specifically TRON GenSets, ATMAG GenSets, and DESAL GenSets for use in commercial, industrial, and infrastructure projects under contract with Clayco Construction.

2. Definitions and Scope

  • The Technology: Proprietary permanent magnetic energy units operating in a closed-loop, emission-free environment, protected by USPTO, Department of Defense/War, and DOE-recognized intellectual property.

  • The Deployment (Islanded-Only): All units supplied under this MoU are strictly intended for Behind-the-Meter (BTM) and “Islanded” operation. Installations must NOT connect to public utility grid infrastructure.

  • The Regulatory Umbrella: All deployments shall adhere to the Consumer Regulated Electric Utility (CREU) designation, authorizing the end-user (or the building owner) to operate as a private utility for their designated site perimeters.

3. Obligations of the Parties

  • Theron Energy (OEM) & TMG: Shall provide certified hardware, engineering schematics, and ongoing technical support for the integration of TRON and ATMAG GenSets. OEM shall uphold the 50-Year Industrial Warranty covering internal magnetic components and performance integrity.

  • Florida USA Dealer: Shall act as the primary authorized interface for Clayco Construction, managing the procurement, localized logistics, and mandatory site certifications for islanded operation.

  • Compliance Protocol: The Dealer must ensure that Clayco Construction project managers acknowledge the Non-Disclosure/Non-Circumvention (MNDA), as signed by Clayco Construction, regarding proprietary magnetic configuration and generation capacity.

4. Regulatory Compliance & Governing Law

  • Sovereign Perimeter: The parties acknowledge that these gensets are classified as industrial assets. Their operation is subject to the 2026 DATA Act regarding localized energy autonomy.

  • Jurisdictional Usage: These systems are permitted for use ONLY WITHIN THE UNITED STATES OF AMERICA and its territories, as per international patent control and security directives.

5. Term and Termination

This agreement shall remain in effect for the duration of the current project lifecycle with Clayco Construction and may be renewed upon mutual written agreement of all parties. Any breach of the “Islanded” status or unauthorized grid-tie attempts shall result in the immediate revocation of OEM support and warranty protections.

Cornelius B Theron 300x50

Signed: Cornelius Basson THERON
Dated: 8/04/2026 – 09H30

MEMORANDUM OF UNDERSTANDING 
(MoU) – The Executive Order

To ensure legal compliance and verify that this is not only Intellectual Property (IP) but also considered an American asset, and that you will comply with all our foundation and departments and assigned corporate, as well as US Government national security directives, you are rquired as officer of Layton Construction to execute this Memorandum of Understanding below. Together with your signed MNDA, all standards are met.

Please select a valid form
THERON MAGNETIC GENERATORS